Home |
About Us | Safety | Capabilities | SMC Team | Project Portfolio | Awards | Testimonials | Contacts | Sales Video

 

Dundalk/Sollers Point High School

Stella May Contracting

Project/Contract Title: #1274 Dundalk /Sollers Point High School
Construction of New School Package 1 Phase 1 Site Work
Dundalk/Sollers Point High School
POC: Urban N. Zink Contractors, Inc.
Ron Zink – (410)335-3456
Project Location: Delvale Avenue Baltimore County, Dundalk, MD
Contract Value: $1,043,956.00
Completion Date: August 2011
Project Manager: Chuck Cross
Project Description: Site Utility Package consisting of Site Domestic Water, Site Sanitary Sewerage System, and Site Storm Drain System/Storm Water Management. Approximately 5,100 lf of (4,6,8,10,12,15,1824,30,36) HDPE storm drain pipe to be installed along with 22 storm manholes and 28 storm inlets. Sanitary sewerage system consists of 2,800 lf of (2,4,6,8”) PVC, a 72” Sewerage Lift Station and appurtances, and 7 manholes. The domestic water system consists of 2,300 lf of 6”&8” DIP water, 4 fire hydrants, and a 12”x8” tapping sleeve & valve. Additional items of work included a 12’x6’ grease interceptor, installation of 4 Neutralizer Tanks, demolition of existing utilities, and installation of temporary water connections.
NAICS Codes:  

Go to General Contracting List | Go to Subcontracting List




© 2017 Stella May Contracting | (410) 679-8306 | SMC@StellaMay.com | SITE MAP | Webmaster: Infopathways, Inc.