16” Water Main Replacement with 20” PVC and Appurtenances

Project/Contract Title: #1247 - Meade Water Main
POC: James Waller, Sr. P.E. CGSI (301) 300-1128
Project Location: Ft George Meade
Contract Value: $1,284,800.00
Completion Date: Spring 2010
Project Manager: Chuck Cross
Project Description: Installation of approximately 6,000 lf of 20” PVC Water Main and 3ea 20” Valves and Vaults. Approximately 640 lf of the main directional drilled under a stream crossing with fusion HDPE pipe.